top of page
Boston Whaler tow arch installation
2 - 4 volunteers needed ASAP to install the tow arch that was removed from the Avon RIB on the Boston Whaler. Brackets will need to be constructed with thru-hull mounting.


Time & Location
Apr 06, 2025, 7:00 a.m. – 5:00 p.m.
74 Lighthouse Rd, 74 Lighthouse Rd, St. Catharines, ON L2N 7P5, Canada
Descriptions
Job Description:
Install the tow arch that was removed from the Avon RIB on the Boston Whaler. Brackets will need to be constructed with thru-hull mounting. This will have load requirements (towing dinghies and docks) so some engineering is required.
Tools that we may require: Drills, cutting devices, welders?
Technical Abilities: Engineering, mechanical.
Email: james.desjardins@dalhousieyachtclub.com
Email: neil.brockman@dalhousieyachtclub.com
bottom of page